Edit it in Health Facility Briefing System (HFBS) | |||
---|---|---|---|
![]() |
Edit this room data or print a PDF using the HFBS - Health Facility Briefing System. Customise this room data for your project, or add it to an existing health facility brief in HFBS Briefing Module. | Edit Briefing |
Room Layout Sheet | |||
---|---|---|---|
![]() |
Download a PDF Room Layout Sheet (RLS) for this standard component. | Free | View |
Other Files | |||
---|---|---|---|
![]() |
Buy an edible AutoCAD DWG Room Layout Sheet (RLS) for this standard component. | $2.99 | |
![]() |
Buy an edible Revit Room Layout Sheet (RLS) for this standard component. | $64.99 |
Online Room Data Sheet |
---|
Room Code | BMEQ-4-I |
Net Room Area Briefed | 4 |
Hours of Operation | 24 Hours |
Occupancy | N/A |
Description / Special Requirements | An open storage bay for one or more items of mobile equipment in frequent use which may include wheelchairs, mobile scales, commode chairs, patient lifting devices or other mobile equipment. Special Design Requirements: The Bay should be deep enough to ensure equipment stored does not impede corridor circulation; bay depth 800 -1200mm depending on equipment to be stored. If the the bay is used to store equipment that requires recharging, appropriate power outlets should be provided. |
Amendment | 24.10.2010 First Draft 02.09.2014 FF amended. 28.10.2014 FF modified. |
ID | Fabric | Material | Finish | Specification | Selection | Remarks |
1000 | Floor finish | Vinyl | Standard slip resistant | Seamless, coved | carpet optional | |
2000 | Skirting | Vinyl | Prefinished | Floor vinyl coved, 150mmH | or timber skirting over carpet | |
3000 | Wall finish | Paint | Acrylic, washable | |||
4020 | Wall protection | Composite | Prefinished PVC | Crash rail at 900 AFFL | ||
4031 | Wall protection | Composite | Prefinished PVC | Corner guards to 1500 AFFL | ||
4022 | Wall protection | Composite | Prefinished PVC | Crash rail at 350 AFFL | optional | |
6025 | Cornice | Aluminium | Powdercoat | shadow line | ||
5010 | Ceiling | Plasterboard | Paint, washable | Flush set, suspended |
ID | Description | Category | Group | Qty | Selection / Remarks |
7200 | Hook: equipment | Metalwork | 1 | 1 | |
7400 | Trolley: equipment | Furniture/ Fitting | 3 | 1 | as required |
17200 | Slide boards: patient | Furniture/ Fitting | 3 | 1 | on wall equipment hook |
ID | Description | Grp | Qty | Ele | Data | CdW | HtW | WmW | Tap | Dns | Gas | Selection / Remarks |
ID | Description | Service Category | Qty | Selection / Remarks |
5000 | Airconditioning | HVAC | ||
6000 | General fluorescent | Lighting | ||
9001 | GPO: Double | Power | 2 | For recharging of electrical equipment |