Edit it in Health Facility Briefing System (HFBS) | |||
---|---|---|---|
![]() |
Edit this room data or print a PDF using the HFBS - Health Facility Briefing System. Customise this room data for your project, or add it to an existing health facility brief in HFBS Briefing Module. | Edit Briefing |
Online Room Data Sheet |
---|
Room Code | CORR-PR-I |
Net Room Area Briefed | 0 |
Hours of Operation | 24 hours |
Occupancy | N/A |
Description / Special Requirements | Internal circulation Corridor in procedural areas that include HEPA filtered air such as Operating Suite, Day Surgery, Endoscopy, Medical Imaging Interventional procedures areas, Cardiac Catheter Labs, Isolation Units, Burns Unit, Oncology Units including Transplant units. Corridor widths must be sized to allow for the safe movement and passing of trolleys, beds and equipment, 2600mm to 2800mm clear width is recommended. Area (m2) is included in HPU circulation which may be esitmated as a percentage added to the Net Briefed Area or measured off a plan. 1 x GPO-Cleaner should be provided per 10 metres or as per local authority requirements. Corridor lighting, where patients are transported on trolleys, should be positioned to prevent unnecessary glare to patient eyes. Light fittings shall be recessed, flush fitting and sealed to prevent dust ingress. |
Amendment | 28.08.2017 - First Draft. |
ID | Fabric | Material | Finish | Specification | Selection | Remarks |
3000 | Wall finish | Paint | Acrylic, washable | |||
4020 | Wall protection | Composite | Prefinished PVC | Crash rail at 900mm AFFL | ||
3528 | Wall protection | Handrail at 900mm AFFL | to corridors accessed by ambulant patients | |||
9225 | Doors | Solid Core/ Glass | Paint | Double leaf, observation panel | to Corridor zones; 1800mm clear opening; doors widths to ensure ease of movment of trolleys/beds; hold open devices may be applied, magnetic hold open devices to fire doors must be connected to the fire alarm system; entry doors should be lockable | |
5010 | Ceiling | Plasterboard | Paint, washable | Flush set, suspended | ||
6021 | Cornice | Tape set | Paint | Set between plasterboard wall and ceiling | plasterboard cornice should be easy to clean and not provide dust gathering surfaces | |
4031 | Wall protection | Composite | Prefinished PVC | Corner guards to 1500mm AFFL | where required; align heights of corner guards with other corridor elements | |
2530 | Door protection | Composite | Prefinished PVC | Protection plate to 900mm AFFL, minimum | ||
1000 | Floor finish | Vinyl | Standard slip resistant | Seamless, coved | ||
2000 | Skirting | Vinyl | Prefinished | Floor vinyl coved, 150mmH | ||
8040 | Door protection | Composite | Prefinished PVC | To door frame | optional; to be decided at project level. |
ID | Description | Category | Group | Qty | Selection / Remarks |
5830 | Dispenser: antiseptic hand rub | Furniture/ Fitting | 2 | 1 | Number to suit corridor layout and Infection Control policies. |
ID | Description | Grp | Qty | Ele | Data | CdW | HtW | WmW | Tap | Dns | Gas | Selection / Remarks |
ID | Description | Service Category | Qty | Selection / Remarks |
8040 | Annunciator | Nurse Call | 1 | Ceiling mounted; number to suit corridor layout |
9015 | GPO: Cleaner | Power | 1 | 1 every 10 metres recommended; number and location to comply with local authority requirements. |
10020 | Card access | Security | 1 | To unit entry doors where required |
5005 | Air conditioning: special | HVAC | HEPA filtered air in sterile zones | |
2485 | General LED: fully recessed | Lighting | sealed |