Edit it in Health Facility Briefing System (HFBS) | |||
---|---|---|---|
![]() |
Edit this room data or print a PDF using the HFBS - Health Facility Briefing System. Customise this room data for your project, or add it to an existing health facility brief in HFBS Briefing Module. | Edit Briefing |
Room Layout Sheet | |||
---|---|---|---|
![]() |
Download a PDF Room Layout Sheet (RLS) for this standard component. | Free | View |
Other Files | |||
---|---|---|---|
![]() |
Buy an edible AutoCAD DWG Room Layout Sheet (RLS) for this standard component. | $2.99 |
Online Room Data Sheet |
---|
Room Code | SCRB-6-I |
Net Room Area Briefed | 6 |
Hours of Operation | 24 Hours |
Occupancy | Up to 2 |
Description / Special Requirements | The Scrub-up/ Gowning 6m2 provides for pre-operative scrubbing and gowning/ gloving, located adjacent to a Procedures Room or Imaging Room. Additional Design Considerations: - A minimum of 800mm is required between scrub stations - Taps to be non touch - automatically operated or foot operated |
Amendment | 24.10.10, - First Issue 21.04.11, - Services modified |
ID | Fabric | Material | Finish | Specification | Selection | Remarks |
1000 | Floor finish | Vinyl | Standard slip resistant | Seamless, coved | ||
1020 | Floor finish | Vinyl, non-slip | Safety | Seamless, coved | to wet zone | |
2000 | Skirting | Vinyl | Prefinished | Floor vinyl coved, 150mmH | ||
4031 | Wall protection | Composite | Prefinished PVC | Corner guards to 1500 AFFL | ||
5010 | Ceiling | Plasterboard | Paint, washable | Flush set, suspended | ||
3052 | Wall finish | Vinyl | Prefinished | Wall vinyl to 1500mm AFFL | ||
6025 | Cornice | Aluminium | Powdercoat | shadow line | ||
3010 | Wall finish | Paint | Scrub resistant |
ID | Description | Category | Group | Qty | Selection / Remarks |
6158 | Dispenser: soap antiseptic | Furniture/ Fitting | 2 | 2 | |
6164 | Dispenser: scrub brush | Furniture/ Fitting | 3 | 2 | |
8390 | Trolley: gowns | Furniture/ Fitting | 3 | 1 | optional |
12300 | Linen carrier: dirty, single | Furniture/ Fitting | 3 | 1 | |
19810 | Shelf: SS, over | Metalwork | 1 | 1 | over scrub trough |
ID | Description | Grp | Qty | Ele | Data | CdW | HtW | WmW | Tap | Dns | Gas | Selection / Remarks |
9700 | Clock: analogue, electric | 1 | 1 | yes | ___ | ___ | ___ | ___ | ___ | ___ | ___ | |
50000 | Sink: scrub trough | 1 | 1 | ___ | ___ | yes | ___ | yes | yes | yes | ___ | auto/knee operated taps x 2 |
ID | Description | Service Category | Qty | Selection / Remarks |
5000 | Airconditioning | HVAC | ||
6000 | General fluorescent | Lighting | ||
9000 | GPO: Single | Power | 1 | for clock |