The Shared Scrub-up Gowning room provides an enclosed area for pre-operative scrubbing and gowning/ gloving, shared between two Operating/ Procedure Rooms.
Acoustics: Sound attenuation level - medium; acoustic privacy required
Additional Design Considerations:
- A minimum of 800mm is required between scrub stations
- Taps to be non touch - automatically operated or foot operated
Amendment
24.10.10, - First Draft
Fabric and outline specifications
ID
Fabric
Material
Finish
Specification
Selection
Remarks
1000
Floor finish
Vinyl
Standard slip resistant
Seamless, coved
1020
Floor finish
Vinyl, non-slip
Safety
Seamless, coved
to wet zone
2000
Skirting
Vinyl
Prefinished
Floor vinyl coved, 150mmH
3010
Wall finish
Paint
Scrub resistant
5010
Ceiling
Plasterboard
Paint, washable
Flush set, suspended
7010
Observation
Glass
Clear
Through door/s
with cover, (sliding)
8010
Door protection
Composite
Prefinished PVC
Protection plate to 900 AFFL
8040
Door protection
Composite
Prefinished PVC
To door frame
4031
Wall protection
Composite
Prefinished PVC
Corner guards to 1500 AFFL
As required
6025
Cornice
Aluminium
Powdercoat
shadow line
3052
Wall finish
Vinyl
Prefinished
Wall vinyl to 1500mm AFFL
9004
Doors
Solid Core/ Glass
Paint
Single leaf, observation panel
920mm clear opening to Operating Rooms, double swing